March 6, 2012
Progress is being made in the Czech Republic on two key urban tunnel projects. In capital Prague, the Czech contractor Metrostave has now completed the drilling portion of the Letna section of the Blanka road tunnel. Local residents have complained about the noise, vibration and cracks in their properties that they say have been generated by the drilling and blasting work. The project looks as though its completion date will be later than first planned however.