The concrete plan for drilling

Four tips for optimising concrete dowel drill performance - *Rick Walstad, E-Z Drill Inc president and CEO
July 9, 2018 Read time: 4 mins
Concrete dowel drill maintenance ensures reliability and efficiency

Four tips for optimising concrete dowel drill performance - *Rick Walstad, 2976 E-Z Drill Inc president and CEO

When faced with drilling thousands of concrete dowel holes, the last thing a project needs is a delay due to drill issues. However some key suggestions can help contractors to stay on top of budgets and timelines.   

An important point for a contractor is choosing the right type of concrete dowel drill for a job and there are two different variants to choose from. Concrete dowel drills can operate with a roller bearing feed system while others use a nylon pad system. Both systems move the gangs forward and backward, however friction is the key difference between the two. When nylon pads slide across the carriage it causes friction that loosens the pads and causes them to wear quickly. This means more maintenance, replacement parts and downtime. A roller bearing feed system, on the other hand, features rollers that move the gangs forward and backward on the carriage without friction, which means minimal maintenance and enhanced uptime.

Another important point is with the air supply as a concrete drill cannot function without it and will perform poorly if the air supply is insufficient. When matching an air compressor to a drill, many models will require 2.83m3/min for each drill motor, so a two-gang unit will typically need 5.66m3/min and a three-gang will need 8.49m3/min.

Also, if the drill air hose has too small a diameter, it will not be able to move sufficient air to the drill, resulting in reduced power and drilling speed. A larger diameter air hose, however, will have no effect on drill performance.

To check if a compressor is the right size for a multigang drill, a good option is to turn off all but one of the drill motors. If the remaining drill motor speeds up, then this shows that there is insufficient air volume to keep the drills operating at full capacity. A drill’s owner’s manuals should be an important guide with regard to compressor output and hose sizes.

Using a concrete drill that has not been maintained is one of the most common reasons a drill may not be performing at 100%. Clearly, it is important to regularly check key maintenance points, with oil being the first point.

Oil is critical to concrete dowel drill performance and if an incorrect grade is used, the engine and components could be in jeopardy. Lubricants, such as pneumatic tool oil and automatic transmission fluid, burn off quickly, which can cause drill motor damage. They also contain synthetics, which can damage hoses and O-rings. Rock drill oil is the only kind of oil that should be used with these types of drills.

Check oil as often as once or twice a day, depending on the model, if a drill is in high use  it is crucial to keep the fittings and guide wheels greased.

 

Concrete drills experience a good amount of vibrations during operation, and those vibrations can loosen nuts and bolts over time. Be sure to check trunnion bolts, which secure the latch that holds the bit in the drill. In addition, look at the long bolts that hold the drill motor together or through bolts. Broken trunnion bolts or through bolts can become loose and break, and that can mean costly replacements.

Dry firing can also cause these bolts to break, so be sure to only run the drill when the bit is touching the concrete and drilling into the slab. Also, turn the motor off before retracting the bit from the hole.

And, finally, clean the drill daily using a hose or pressure washer. Dust accumulates quickly on parts and if allowed to become wet, can quickly turn into concrete, which has a significant effect on performance.

If a drill will be stored for a few days or months, it is vital to lubricate its interior parts to prevent rust from forming. Disconnect the hose from the motor and pour a small amount of lubricant (rock drill oil, pneumatic tool oil, even diesel fuel) directly into the motor. Run it at half throttle for a moment to thoroughly coat the interior parts.

Drain condensation from the machine’s filters and cover the drill with a tarp if it will be stored outside.

Before using the drill, ensure the oil reservoir is full and bolts are tight. If it has wheels, check the tyre pressure and blow out the hose that runs between the drill and compressor to ensure it is clean. If dirt or debris has accumulated in the hose, it could be forced into the motor when it starts, affecting the drill’s performance.

Take care of a concrete drill and it will work properly, from ample power for optimal  day-to-day performance to firing right up. This all equates to greater uptime and profits.

 

For more information on companies in this article

Related Content

  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • E-Z Drill highlights 210B-2 on-grade drills at ConExpo 2014
    January 29, 2014
    E-Z Drill’s 210B-2 on-grade drills are being showcased at ConExpo 2014. Part of the 210B Series of on-grade concrete drills and like the 210B model, the 210B-2 is a pneumatic and easy-to-position unit that drills to a standard 45.72cm depth. Both the 210B and 210B-2 drills feature a compact frame, allowing each to operate within a confined area. The units have been specifically designed for straight-line drilling on a level subgrade, and are said to be ideal for airport work, lane additions and large patchw
  • E-Z Drill highlights 210B-2 on-grade drills at ConExpo 2014
    January 6, 2017
    E-Z Drill’s 210B-2 on-grade drills are being showcased at ConExpo 2014. Part of the 210B Series of on-grade concrete drills and like the 210B model, the 210B-2 is a pneumatic and easy-to-position unit that drills to a standard 45.72cm depth. Both the 210B and 210B-2 drills feature a compact frame, allowing each to operate within a confined area. The units have been specifically designed for straight-line drilling on a level subgrade, and are said to be ideal for airport work, lane additions and large patchw
  • Concrete drilling made E-Z
    November 29, 2012
    E-Z Drill is now introducing its Model 210 Equipment-Mounted concrete drill attachment series. Consisting of three models: the three-gang Model 210-3 EQ MT, four-gang Model 210-4 EQ MT and five-gang Model 210-5 EQ MT, the range is said to be compatible with most backhoe loaders and excavators. The pneumatic drills are said to deliver high productivity and lower maintenance needs, suiting them to full-depth road repair and patching projects. A control panel is mounted on the drill and the units are capable