Skip to main content

Another tunnel for Australia’s WestConnex toll road project?

The size of Australia’s largest infrastructure project could get bigger with the addition of another tunnel, according to media reports. The New South Wales state government is considering another tunnel, around 1km long, in the inner west, expanding the size of Sydney's WestConnex toll road project, according to the Sydney Motorway Corporation, which along with its state government client, Roads and Maritime Services, is in charge or the US$12.74 billion project. Sydney Motorway was set up in 2014 an
July 21, 2016 Read time: 2 mins
The size of Australia’s largest infrastructure project could get bigger with the addition of another tunnel, according to media reports.

The New South Wales state government is considering another tunnel, around 1km long, in the inner west, expanding the size of Sydney's WestConnex toll road project, according to the Sydney Motorway Corporation, which along with its state government client, Roads and Maritime Services, is in charge or the US$12.74 billion project.

Sydney Motorway was set up in 2014 and awarded the design-build-own-operate contract by the NSW Government. The latest tunnel would run from Iron Cove Bridge to an interchange at Rozelle, where it would link to the WestConnex motorway.

Roads minister Duncan Gay said that no decision has yet been taken on the final design of the link between the M4 and M5 motorways, "but we are always looking for the best options to fix traffic congestion in Sydney".

It is also unclear if the cost of the new tunnel will come from the WestConnex budget, the Herald reported.

About 200 properties are being acquired for the first stage of WestConnex, and 159 for the second.

Sydney Motorway announced in January that it had award 2376 Egis Projects and 6191 Fulton Hogan Construction a contract for the operation and maintenance of WestConnex.
 
SMC – whose shareholders are Minister for Roads, Maritime and Freight and the Treasurer of NSW – is carrying out work in three stages. The first is for the widening the existing M4 Motorway as well as constructing a 5.5km tunnel extension. The second stage (WestConnex M5) includes building a new 9km road tunnel, which will more than double capacity of the existing M5 East motorway corridor and provide a new interchange, north of the city’s airport. The third stage (WestConnex M4-M5 Link) will link stages 1 and 2 through a new road tunnel, connecting the M4 and M5 corridors.

The contract term for stages 1 and 2 is 10 years. Operation and maintenance will start in 2019. In addition, the contract comprises the operation and maintenance of the existing M5 East Motorway, which had been previously operated and maintained by Egis (as part of the BHEgis joint venture) from 2001 to 2011. M5 East is a 10km motorway with 4.5km of tunnels.

For more information on companies in this article

Related Content

  • Partners win highway operation deal in New South Wales, Australia
    January 11, 2016
    Egis Projects and its partner Fulton Hogan Construction have won a major contract for the operation and maintenance of the WestConnex highway link in New South Wales Australia. The package was awarded by Sydney Motorway Corporation (SMC) to Fulton Hogan Egis O&M (FHEO&M). The partners hold equal 50% shares in the project. Egis has its share in the Australian project through its Australian subsidiary Egis Projects Asia Pacific.
  • New design for Sydney’s WestConnex motorway project third stage
    November 14, 2016
    Sydney’s proposed WestConnex motorway will be wider than planned to accommodate four instead of three lanes in each direction, according to media reports. The changes are part of a revamp of the third and final stage of the ambitious project in the capital city of Australia’s eastern New South Wales state. Some exit and entry ramps will also be scrapped but the overall cost of just under US$5.3 billion for the third stage remains unchanged, reported the Sydney Morning Herald newspaper. The projects
  • New South Wales is seeking financial packers for WestConnex in Sydney
    June 19, 2015
    Investment bank Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government. According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion. Total cost of all three phases over 10 years could be as
  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu