Skip to main content

VIDEO: Pittsburgh says goodbye to 108-year-old Hulton Bridge

January 27, 2016
It took 500 explosive charges to bring down a 108-year-old truss bridge in the US city of Pittsburgh and crews had three days to clear up the debris, according to local news stations.

The blasts dropped the spans of 407m-long Jonathon Hulton Bridge directly into the Allegheny River. It was the first major bridge designed by Allegheny County in the state of Pennsylvania and connected the eastern Pittsburgh city suburbs of Oakmont and Harmarville.

A new steel girder bridge, directly beside it, opened to traffic in October. It has four 3.35m-wide vehicle lanes - two in each direction – and a 1.23m wide median. There are 1.8m shoulders on each side of the road and a sidewalk on the downstream side of the bridge.

Design of the new bridge was by 5412 Gannett Fleming and the contractor was Brayman Construction. Construction management and inspection was by SAI Consulting Engineers and CDR Maguire.

For more information on companies in this article

Related Content

  • Pittsburgh plans propose Parsons for bridge project
    January 9, 2014
    Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehab
  • ARTBA makes awards
    February 29, 2012
    A series of highway and bridge projects across the US have been recognised for their contributions to environmental protection and mitigation.
  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.
  • Major bridge widening project going to plan
    April 11, 2012
    When built it was determined that a vital US road/rail bridge would always be widened. Work on that huge project is going to plan as Patrick Smith reports One of the biggest bridge widening projects in the world is being carried out under an ambitious development programme. At US$1.2 billion, the seven-year scheme to widen the Huey P. Long Bridge in the US state of Louisiana is also the largest of 16 projects planned under the state's TIMED (Transportation Infrastructure Model for Economic Development)