October 18, 2012
Vietnam's Quang Ninh province has backed a new design proposed by Japanese developer SE Group for the 4.3km Bach Dang Bridge. The new design will change the original prestressed concrete bridge design to a steel cable-stayed bridge. The modification will lower the girder height, reduce the bridge length and alter the main span length. The altered draft is awaiting final approval from the authorities. SE Group has also requested to cut the expenses for the project to US $ 386 million from $ 483 million. The