Skip to main content

Pilosio exhibits its durable P300 formwork at bauma

Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
January 6, 2017 Read time: 2 mins
Pilosio’s P300 formwork will be on show at bauma
Among 7163 Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork.

Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses. Spaced every 1.5m², the coupling system is based on a P300 connecting block that ensures speedy assembly and perfect alignment of the formwork.

After degreasing and cleaning and in order to ensure high quality standards and durability, the high resistance steel frame of the P300 formwork is varnished for immersion and drying in an oven at 130°. The result is said by Pilosio to be a frame that is highly resistant to scratches and oxidation. The multi-layered panel is 18mm thick with surface protection from phenolic film (220g/m²). It is made up of 13 layers of birch with a protected, zero moisture absorption panel. The edges are protected with varnish and it can be used around 100 times per side. It weighs 11.35kg per m². The P300 formwork is designed and made in the Pilosio factories in accordance with EN 15113-1/206 regulations.

Stand: N 1020/1

%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 81714 0 oLinkExternal www.pilosio.com www.pilosio.com false /EasySiteWeb/GatewayLink.aspx?alId=81714 false false%>

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

For more information on companies in this article

Related Content

  • Pilosio exhibits its durable P300 formwork at bauma
    February 15, 2013
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • 3rd gala edition of Pilosio International Building the Peace Award at bauma
    January 6, 2017
    The construction industry’s social, contemporary and practical contribution to developing modern society and improving worldwide living conditions will be celebrated during bauma at the 3rd gala edition of the Pilosio International Building the Peace Award. The event, presented by renowned former CNN journalist Aleesio Vinci, will take place from 5pm on Wednesday April 17th 2013 at the Pilosio Stand (N 1020/1). The two previous editions in 2011 and 2012 drew guests from around the world from more than 20 c
  • 3rd gala edition of Pilosio International Building the Peace Award at bauma
    April 9, 2013
    The construction industry’s social, contemporary and practical contribution to developing modern society and improving worldwide living conditions will be celebrated during bauma at the 3rd gala edition of the Pilosio International Building the Peace Award. The event, presented by renowned former CNN journalist Aleesio Vinci, will take place from 5pm on Wednesday April 17th 2013 at the Pilosio Stand (N 1020/1). The two previous editions in 2011 and 2012 drew guests from around the world from more than 20 c
  • REMU launches Combi E8 screening plant
    April 16, 2013
    Finnish company Remu has launched its new screening plant, the Remu Combi E8. A non-clogging screening plant for preparing topsoil and processing various waste materials, the re-engineered solutions have increased screening capacity by a wider 950mm screening table and a new 2.6m3 feeder unit.