Skip to main content

Aceh Road Rehabilitation project wins key IRF GRAA award

The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th
May 15, 2014 Read time: 3 mins
Aceh Road ribbon cutting ceremony
The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries.

Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated the Banda Aceh region and its ability to conduct economic activity, United States Agency for International Development (1372 USAID) stepped forward and signed a Strategic Objective Agreement with the 1065 Indonesian Government for tsunami-related post relief activities, which included the reconstruction and rehabilitation of the national coastal road between the provincial capital of Banda Aceh and Calang, the government centre of the Aceh Jaya District. USAID employed 3220 Parsons to design and manage construction of the road.

The design of the new road had to take into account Aceh’s unique blend of rainforest, coastal swamplands, and steep limestone hills. The alignment’s design also had to comprise segments of new road to replace roads that had disappeared where the coastline was reshaped. USAID made an important decision to focus on the quality, safety, and durability of the new road at the expense of quick completion. Instead of simply reconstructing the pretsunami road, which in large part would have involved overlaying and following the alignment of the 6m-wide, two-lane road, an 11m-wide road that included 2m paved shoulders and built to a higher national standard was provided. Where possible, the road was also constructed inland from the coast and on higher ground to improve its durability. The scope of the reconstruction ultimately comprised 145 km of road, as well as 27 steel truss and concrete bridges and 273 drainage culverts.
With consideration of the plight of the region and the immediate need for a paved road, USAID awarded a priority contract to 5207 Wijaya Karya for the immediate construction of a mainly new road in the highly travelled northern area approaching Banda Aceh. USAID subsequently awarded two additional contracts to Ssangyong and 5206 Hutama Karya to construct the remainder of the road. The decision to provide sections of new alignment carried risk. Getting legal access to the land needed for the right of way involved the procurement of more than 4,000 properties. This figure is tragically large because many of the landowners at the time of the tsunami were killed while official records of land titles and property ownership were washed away.

USAID managed a reconstruction effort challenged by many obstacles. Team building with government leaders was essential to overcome major local roadblocks. The Aceh Road project helped the Aceh province recover from a devastating natural disaster and significantly improved the quality of life throughout the region. In the process, it contributed to peace and stability in a once troubled region.

More information at: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Parsons.com/projects/pages/aceh-road.aspx website: www.parsons.com/projects/pages/aceh-road.aspx false http://www.parsons.com/projects/pages/aceh-road.aspx false false%>


2014 GRAA Applications

The Global Road Achievement Awards (GRAA) is a one-of-a-kind competition to recognize innovative road projects and exemplary people that place the road industry at the forefront of worldwide social and economic development. Entries should be submitted by June 30, 2014.

More information at %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.irfnews.org/graa website: www.irfnews.org/graa false http://www.irfnews.org/graa false false%>











For more information on companies in this article

Related Content

  • IRF’s GRAA awards applications deadline
    June 23, 2014
    Applications for this year’s International Road Federation (IRF) Global Road Achievement Awards (GRAA) had to be in by Monday 30 June 2014. GRAA is a one-of-a-kind competition to recognise innovative road projects and exemplary people that place the road industry at the forefront of worldwide social and economic development. The IRF views the awards as an important way to promote road innovation around the world and will make substantial efforts to see that the awarded achievements receive maximum wor
  • Kosovo motorway wins IRF award
    May 30, 2013
    Kosovo’s Route 7 Motorway is an 84km dual carriage motorway that will span Kosovo from the southwest border with Albania to the capital city of Pristina, tying the heart of Kosovo to the Albanian port city of Durres. This motorway is part of the pan-European motorway network for Southeast Europe and provides a key trade corridor. In November 2011, Bechtel-Enka General Partnership (BEGP) successfully delivered 38km to the people of Kosovo, only 19 months after the contract award. The second main achievement
  • High fatality rates around the world
    March 13, 2014
    In 2010, global road traffic injuries resulted in 1.3 million deaths and were the eighth leading cause of death, with 90% of fatal injuries taking place in low- and middle-income countries At the root of this crisis in the developing world are persisting managerial and technical capacity weaknesses. For many fast-motorising countries, fragmented legislation, poorly targeted funding, ineffective institutional leadership, and outdated road engineering practices could all translate into failure to meet road
  • Angolan project wins IRF Construction Methodology Award
    June 14, 2012
    Engineering firm Exergia completes vital communication route using innovative construction methodology. The devastation caused by a 35-year armed conflict has led to a high state of degradation of Angola’s network of roads and bridges, presenting a significant impediment to the country’s recovery. In 2002, the Government of Angola created an extensive rehabilitation and reconstruction program of the road system. As part of this program, the rehabilitation of National Highway 120, the main road linking